Super Copper Defines 600-Meter Drill Target at Castilla Following Surface Samples of 17.7% Copper
Canada NewsWire
VANCOUVER, BC, Nov. 17, 2026
Target traced across four consecutive IP survey lines, over at least 600 meters and open along strike, lines up with surface grab samples that returned up to 17.7% copper, 53.8 g/t gold, and over 50.0% iron.
VANCOUVER, BC, Nov. 17, 2026 /CNW/ -- SUPER COPPER CORP. (CSE: CUPR) (OTCQB: CUPPF) (FSE: N60) ("Super Copper" or the "Company") is pleased to report results from the induced polarization ground physics ("IP") survey it has completed at the 100%-owned Castilla copper project in Chile's Atacama Region.
No historical drilling has been reported for Castilla. The survey is the Company's first look below surface where 2025 grab samples returned up to 17.7% copper (Cu), 53.8 g/t gold (Au) and over 50% iron (Fe). It traced a chargeability feature that lines up with historical artisanal workings on four survey lines in a row in the Triveta Zone, identifying a priority drill target extending at least 600 meters at Castilla. The target feature, called Celeste, remains open along strike and has never been tested by a drill hole.
Located near the past-producing Manto Negro copper mine, Castilla gives Super Copper a second project advancing toward drilling while its maiden program at Cordillera Cobre delivers initial copper assays.
Key highlights
- Never-drilled target lines up with high-grade copper and gold. At Celeste, a chargeability feature was traced on four consecutive survey lines spaced 200 meters apart. It covers at least 600 meters of strike and remains open along strike. It coincides with historical underground workings where a 2025 grab sample returned 53.8 g/t gold, 17.7% copper and over 50.0% iron.
- A second target on the same lines. Another chargeability feature on the Celeste lines coincides with historical workings where a 2025 grab sample returned 15.9 g/t gold.
- Beside a mine that produced copper. The Castilla Project is close to the past-producing Manto Negro open-pit copper mine. Historical records indicate that approximately 1.3 million tonnes averaging 1.2% acid-soluble copper were mined at Manto Negro between 2005 and 2009. Mineralization at Manto Negro is not necessarily indicative of mineralization at Castilla.
- Three structural corridors. IP and drone magnetic data, read together, define at least three structural corridors extending 0.5 to 1 kilometer.
- Two projects advancing in lockstep. First assays at Cordillera Cobre confirmed copper in all four holes reported on November 10, 2026. Castilla is advancing toward its first drill program.
- More news coming. Assays for holes 5 to 8 at Cordillera Cobre, results from follow-up sampling at Castilla and a ranked list of Castilla drill targets are all ahead.
Surface grab samples are selective and are not necessarily representative of the property. Geophysical anomalies require drilling to establish their source. Nearby mine results do not establish Castilla's grade, size or economic potential.
"Castilla has never had a single drill hole in it, and we now know where the first ones should go," said Zachary Dolesky, Founder and CEO of Super Copper. "We have grab samples at surface that returned up to 17.7% copper and 53.8 g/t gold, artisanal miner workings, and a past-producing copper mine nearby. What we did not have was a drill target. Now we do. Castilla's new drill target shows up on four survey lines in a row, runs at least 600 meters and is still open, which is what we hoped that geophysics would deliver. We ran the same playbook at Cordillera Cobre, and all four holes assayed so far hit copper. Castilla gives our shareholders direct exposure to a second copper project heading for its first drill test, with more results still to come from Cordillera Cobre."
A Never-Drilled Project Beside a Past-Producing Copper Mine
Castilla lies within the Atacama Fault System setting near the historic Manto Negro open-pit copper mine (Figure 1). As summarized in the Company's July 8, 2025 acquisition announcement, historical records indicate that approximately 1.3 million tonnes averaging 1.2% acid-soluble copper were mined at Manto Negro between 2005 and 2009 and trucked to the Biocobre processing plant.
Castilla is approximately 5 kilometers from the Pan-American Highway and a high-voltage power corridor. Access to established regional infrastructure is a practical advantage for exploration. Manto Negro is a separate property: its historical production has not been verified by the Company, and its grades, tonnage and processing performance are not necessarily indicative of results at Castilla. No mineral resource or processing route has been established at Castilla.

Castilla's new drill target emerges as a priority
The significance of the IP survey results is the alignment of independent exploration evidence: sampled copper and gold at surface, historical workings, and a subsurface geophysical (chargeability) response repeated across neighboring survey lines. That combination gives the technical team a defined area to test beneath the workings and along the target's projected continuation.
At the Celeste target (Figures 2 to 4), the tabular chargeability feature appears on four consecutive lines spaced 200 meters apart and remains open along strike. It coincides with historical workings where a 2025 grab sample returned 53.8 g/t gold, 17.7% copper and over 50% iron. A second feature on the same lines coincides with workings where a grab sample returned 15.9 g/t gold. Of the 95 rock grab samples reported on July 30, 2026, 22 returned more than 1.0 g/t gold.
The subsurface evidence guiding drill targeting




Key Interpretation
The combined data suggest the copper, gold and iron mineralization sampled at surface extends to depth, in subtabular-shaped bodies striking north-northwest and north-northeast and dipping mainly to the west.
- Chargeability highs may reflect sulfide minerals below surface.
- High-resistivity features are interpreted to reflect silicification and quartz veining.
- Subtabular-shaped chargeability and resistivity features coincide with several historical artisanal workings sampled in earlier programs.
- The highest-chargeability zones are untested by drilling, and the Celeste feature remains open along strike.
The Company is exploring Castilla using an iron oxide copper-gold (IOCG) exploration model. These results give the Company its first defined drill targets at Castilla, a project that has never been drilled.
Two Projects, One Playbook
Castilla is one of two Super Copper projects in Chile. It is following the path the Company took at Cordillera Cobre: a magnetic survey, then an IP survey, then drilling.
At Cordillera Cobre, that path led to the Company's maiden diamond drill program at the El Alto target. On November 10, 2026, Super Copper reported assays for the first four holes, and all four intersected copper. Hole DH26CC-002 returned 19.2 m of 0.34% copper and 3.3 g/t silver from 310.0 m, including 1.3 m of 2.21% copper and 24.7 g/t silver. Copper-bearing mineralization has been logged in all eight completed holes along an 800-meter trend. Holes 5 to 8 are visual logs only, with assays pending, and a ninth hole was being drilled at that date. Intervals are drilled core lengths, and visual logging is not a substitute for assays. See the Company's news release dated November 10, 2026 for details, including QA/QC.
Castilla is Super Copper's second project moving toward its first drill test while results continue to come in from the first.
What's Next
- Assays for holes 5 to 8 at Cordillera Cobre
- Results from the follow-up sampling and mapping at Castilla
- Ranked list of Castilla drill targets with planned meterage
- First drilling at Castilla
Survey methods
The induced polarization survey was carried out by Argali Geofísica on behalf of Super Copper. It comprised 14 lines, each approximately 2 kilometers long and oriented mainly east-west, for a total of approximately 28 line-kilometers. Most lines were laid out in pairs 200 meters apart and covered target areas in the southern, central and northern portions of the Castilla project. The survey was expanded from the 12 lines and approximately 22 line-kilometers announced on September 8, 2026. Argali Geofísica acquired the induced polarization data using a dipole-dipole electrode array with a 50 m dipole length and n-levels spanning 1 to 10. Data were acquired in the time-domain mode with a fundamental frequency of 0.125 Hz. Survey lines were placed across target areas selected from surface sampling and magnetic data, including the area of the 53.8 g/t gold grab sample. The chargeability and resistivity results were integrated with the Company's July 2026 drone magnetic survey, surface mapping and rock sampling. The figures in this news release were prepared by APEX Geoscience Ltd.
Qualified Person
The scientific and technical information in this news release has been reviewed and approved by Michael B. Dufresne, M.Sc., P.Geol., P.Geo., of APEX Geoscience Ltd., a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects. Mr. Dufresne is independent of the Company. Mr. Dufresne has verified the data disclosed in this news release by reviewing the IP survey data and the resulting chargeability and resistivity models, and by comparing them with the Company's surface sampling, mapping and drone magnetic data. Geophysical interpretations are preliminary, and the source of the anomalies can only be confirmed by drilling. Mr. Dufresne has not verified any historical production from the artisanal workings at Castilla. Sample type, analytical methods, laboratory and quality assurance and quality control procedures for the surface rock samples referred to in this news release are described in the Company's news release dated July 30, 2026, titled "Super Copper Identifies Kilometre-Scale Targets Beneath High-Grade Surface Copper at the Castilla Project."
Cautionary notes
Grab Samples. Grab samples are selective by nature and are not necessarily representative of the mineralization on the property. Of the 95 rock grab samples reported on July 30, 2026, two collected in 2023 and 93 in 2025, 22 returned more than 1.0 g/t gold.
Geophysical Results. IP chargeability and resistivity are indirect measurements. Chargeability anomalies can be caused by copper-bearing sulfides, but also by barren pyrite, graphite, clay alteration, magnetite and other non-economic sources, and resistivity highs can reflect rock types unrelated to mineralization. Geophysical anomalies are not necessarily indicative of mineralization, and only drilling can determine their source. The Company has not established any relationship between the deeper IP anomalies and the magnetic bodies reported on July 30, 2026. References to an iron oxide copper-gold (IOCG) model describe the Company's exploration approach and do not indicate that an IOCG deposit is present at Castilla.
Historical Workings. References to historical artisanal workings describe their location only. The Company does not rely on any historical production, grade or tonnage information from these workings, and their presence is not necessarily indicative of mineralization of economic grade or quantity.
Nearby property information. Manto Negro information is historical, has not been verified by the Company and is provided solely for regional context. It is not necessarily indicative of Castilla's mineralization, grade, tonnage, metallurgical characteristics or economic potential. Source: the Company's July 8, 2025 news release, citing Scott Jobin-Bevans (2024), NI 43-101 Technical Report for the Buen Retiro Copper Project, prepared by Caracle Creek Chile SpA for Fitzroy Minerals Inc.
Cordillera Cobre results. The summarized drill results were previously disclosed on November 10, 2026. Refer to that release for full results, analytical methods and QA/QC procedures. Intervals are drilled core lengths and true widths are unknown. Visual mineralization in unassayed holes is not a substitute for analytical results. No mineral resource has been estimated at either project.
About Super Copper Corp.
Super Copper is a mining exploration company focused on acquiring, advancing and consolidating global copper assets from early discovery through late-stage development. The Company is advancing its Cordillera Cobre and Castilla copper projects in the Atacama Region of Chile, a region with established mining infrastructure and the operations of global majors. By operating a single, integrated technical team and a milestone-driven acquisition strategy, Super Copper aims to build a portfolio of scalable projects capable of supplying the world's accelerating demand for copper. www.supercopper.com
Cautionary Statement Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements regarding the Company's planned diamond drill program at the Castilla project, including the Celeste target, and its timing, targeted for Q2 2027; the interpretation of IP, magnetic, geological and geochemical data; the potential for sulfide, copper or gold mineralization within or below the chargeability anomalies; the extent of anomalies along strike; the follow-up sampling and mapping program and the ranking of drill targets; the reporting of results from the Company's exploration programs; the Company's expectation that, based on its current budget, it will not need to raise capital in the next 12 months; and the Company's plans for further exploration. Forward-looking information is based on management's current expectations and assumptions, including that the Company will spend in line with its current budget and that costs will not materially exceed it; that required permits and access will be obtained on acceptable terms and timelines; that drilling contractors and equipment will be available; and that the Company's interpretation of exploration data is reasonable. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially, including that geophysical anomalies may be caused by non-economic sources; that exploration results may not be consistent with the Company's expectations; that permitting, access, contractor or weather delays may affect the timing of drilling; that costs may exceed budget or plans may change, requiring the Company to raise additional capital sooner than expected, which may not be available on acceptable terms; that the Company's interpretations of geological, geophysical and geochemical data may not be accurate; and general business, economic and market conditions. There can be no assurance that forward-looking information will prove accurate, and readers should not place undue reliance on it. The Company does not undertake to update forward-looking information except as required by applicable securities laws.
Neither the Canadian Securities Exchange nor its Regulation Services Provider has reviewed or accepts responsibility for the adequacy or accuracy of this news release.
SOURCE Super Copper Corp.
